![Treatment of power drawn by CTU-connected 750 MW Rewa Solar Project during nongeneration night hours and during shutdown periods and determination of tariff thereof – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Treatment of power drawn by CTU-connected 750 MW Rewa Solar Project during nongeneration night hours and during shutdown periods and determination of tariff thereof – EQ Mag Pro
0
0
Treatment of power drawn by CTU-connected 750 MW Rewa Solar Project during nongeneration night hours and during shutdown periods and determination of tariff thereof.
For more information please see below link:
Related posts:
- Petition For Approval of the Tariff of Bongaigaon Thermal Power Station (750 MW) For the Period From COD of Unit-1
- Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of the Badarpur Thermal Power Station (705 MW). NTPC Limited – EQ Mag Pro
- Petition For Revision of Tariff For the Period 2014-19 And Determination of Tariff For the Period 2019-24 in Respect of Parbati-III Power Station NHPC Limited
- Petition for adoption of tariff for 400 MW Renewable Energy Projects connected to the inter-State Transmission System – EQ Mag Pro