
TSERC Commission invites comments in the matter of Suo-Moto determination of variable cost for existing biomass, bagasse and industrial waste based power projects in Telangana
0
0
Commission invites comments and suggestions in the matter of Suo-Moto determination of variable cost for existing biomass, bagasse and industrial waste based power projects in the State of Telangana, and having power purchase agreements (PPAs) with the distribution licensees, for FY 2020-21 to FY 2023-24 on or before 03.08.2020 5PM.
For more information please see below link:
Related posts:
- Commission passed order in the matter of Suo-Moto Determination of Generic Tariff for electricity generated from RDF based power projects
- Commission passed order in the matter of Suo-Moto Determination of Variable Cost for existing Biomass, Bagasse and Industrial waste based power projects in the State of Telangana
- Virtual Public Hearing in the matter of Suo-Moto determination of pre-fixed levelised tariff of solar plants under Component-A of (PM-KUSUM) Scheme
- Tripura Regulator determines levelised tariff at Rs. 3.31 /kwh for a period of 25 years
tags:
TSERC