Two Coal Mines put up for Auction on First day of 7th Round Commercial Auction – EQ Mag
Combined Geological Reserves comes to 516.34 million tonnes
Capital Investment of Rs. 450 Crores Expected
The Ministry of Coal had launched the auction of coal mines for commercial mining under 7th round and second attempt of 6th round on March 29, 2023. After evaluation of bids, forward e-auctions for six mines were commenced from 01.08.2023.
On the first day, two coal mines were put up for auction of which one mine was CMSP coal mine and the other one was MMDR coal mine. The details of the mines are as under: –
- One coal mine is fully explored and the second one is partially explored.
- The total geological reserves for these two mines are 516.34 Million Tonnes (MT).
- Cumulative peak rated capacity (PRC) for these coal mines is 3 Million Tonne per annum (MTPA).
The result for Day 1 is as under :
Sl. No. | Name of the Mine |
State |
PRC (MTPA)
|
Geological
Reserves (MT) |
Closing Bid Submitted by
|
Reserve Price (%)
|
Final Offer (%)
|
1 |
North Dhadu (Western Part) |
Jharkhand
|
3.00 |
434.65
|
NLC India Limited | 4.00 |
6.00
|
2 |
Pathora West |
Madhya Pradesh |
NA |
81.69 |
Shri Bajrang Power and Ispat Limited |
4.00 |
18.25 |
Upon operationalization, these coal mines will generate Annual Revenue of Rs. 337.54 crores calculated at PRC of these coal mines (excluding partially explored coal mines). These mines will attract capital investment of Rs. 450 crores and will provide employment to 4,056 people.
Related posts:
- 63 solar micro grids of 1899 kWp aggregated capacity reported to be installed in the country: Shri R.K. Singh
- BlackRock Targets Storage With New Multibillion-Dollar Renewables Fund
- SunAlpha Successfully Commissions Largest Solar Plant in Rajasthan Under PM – KUSUM Scheme
- ‘50% energy cost is saved by rooftop owners in ME’ – EQ Mag Pro