UPDATE ON MEETING WITH STATE ADMINISTRATION OF KARNATAKA : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 10GW ISTS CONNECTED SOLAR PV POWER PLANT LINKED WITH 3GW (PER ANNUM) SOLAR MANUFACTURING PLANT UNDER GLOBAL COMPETITIVE BIDDING (PHASE-I)
This has reference to the RfS No. SECI/C&P/RfS/5GW MANUFACTURING/P-1/052018 dated 25.05.2018 regarding Selection of Solar Power Developers for Setting up of 10GW ISTS Connected Solar PV Power Plant linked with 3GW (Per Annum) Solar Manufacturing Plant under Global Competitive Bidding (Phase-I).
The second pre-bid meeting for the subject tender has been organized on 06.09.2018 @ 11:00 HRS (IST) at SECI, New Delhi Office.
As discussed, a Meeting with the State Administration of Karnataka has been scheduled on 24.09.2018 @ 11:00 AM at Conference Room, Karnataka Udyog Mitra, No. 49, 3rd Floor, Khanija Bhawan, Race Course Road, Bengaluru
Contact Persons : Sh. Manas Ranjan Mishra, Manager (C&P) and Dr. YBK Reddy, Dy. General Manager (Solar) (0091 11 71989294/ 0091 11 71989230)
As the meeting will be chaired by Principal Secretary (Commerce & Industries Department), it is requested that atleast 01 senior level participant from a bidder shall attend the meeting.
The copy of agenda to be discussed is attached herewith.
As desired by the State Authorities, Prospective Bidders are requested to confirm the participation through e-mail (contracts@seci.co.in) latest by 18:00 HRS on 21.09.2018.
Prospective bidders are requested to remain updated for any notices/ amendments/ clarifications etc. to the RfS documents through the websites www.seci.co.in and https://www.tcil-india-electronictender.com as no separate notification will be issued.
Tender Search Code (TSC) for the RfS in TCIL : SECI-2018-TN000018
Tender ID for the RfS in CPPP : 2018_SECI_324874_1
Source: seci.co.in
Related posts:
- Engie Eyes Bid for $19.8 Billion Utility Firm Innogy
- Blockchains, LLC And NV Energy Sign Agreement To Work On Blockchain-Powered Collaborative Energy Projects
- JinkoSolar Large-Area N-Type TOPCon Monocrystalline Silicon Solar Cell Reaches Record High Efficiency of 24.2%
- Retrofitting Coal Power Plants With Carbon Capture May Lead To Increased Water Stress