Uttar Pradesh Floats Tender for 20 MW of Slop-Based Power Projects
0
0
The last date for submission of bid is September 15, 2020
Uttar Pradesh Floats Tender for 20 MW of Slop-Based Power Projects
For more information please see below link:
Related posts:
- Implementation of Grid Tied Solar Power Project Having 100 MW (AC) Capacity in Bangladesh
- Supply and IAND C of string monitoring box for 20MW NTPC Gandhar SPV project
- Bangladesh Floated Bids for Implementation of 100 MW of Wind Projects on BOO Basis
- SJVN Floats Tender For Supply of 75 MW of Solar Power Project in Uttar Pradesh
tags:
power Renewable Energy SLOP BASED tender Uttar Pradesh UTTAR PRADESH POWER CORPORATION LIMITED.