WBSEDCL FOR ISSUANCE OF APPROPRIATE ORDER THE WBERC AS AMENDED SO THAT CONSUMERS OF WBSEDCL DOES NOT REQUIRE TO BEAR HIGH ENERGY COST OF THERMAL POWER STATION
0
0
IN THE MATTER OF APPLICATION MADE BY THE WBSEDCL FOR ISSUANCE OF APPROPRIATE ORDER THE WBERC AS AMENDED SO THAT CONSUMERS OF WBSEDCL DOES NOT REQUIRE TO BEAR HIGH ENERGY COST OF THERMAL POWER STATION.
For more information please see below link:
Related posts:
- WBERC approves the investment proposal of Rs.1019 Crore under Strengthening and Extending Electricity Distribution Network (SEEDN) scheme
- Petition Submitted by WBSEDCL For Determination of Additional Surcharge
- In regard to the application submitted by the WBSEDCL for approval of the connection procedures for solar pv generating system under net metering – EQ Mag Pro